1分6合

News INFORMATION


Nc marker operation procedures in before the start of what to do


Release time:2019/8/15 10:01:01 Source:tg-tools.com/

Abstract:Before input power makes all switches in the off state, ensure that when the input power, devices can't start and not an exception occurs. Before operation, please confirm that the machinery and equipment normal and not cause personal injury, the operator should warn, avoid personal and equipment damage

Nc marker operation procedures before the inspection check and confirm the power switch before operation. Confirm the terminal or the exposed electric parts without short circuit or to ground short circuit. Before input power makes all switches in the off state, ensure that when the input power, devices can't start and not an exception occurs. Before operation, please confirm that the machinery and equipment normal and not cause personal injury, the operator should warn, avoid personal and equipment damage. The safety operation in operation workflow: die after running to the line mechanic to the required marking procedure and start the line operation, after waiting for marking to end, marker return to zero, to complete a working cycle. Machine to start the body and limbs are not allowed to contact the machine moving parts, lest produce damage, maintenance equipment should be without electricity for parking. In the operation of the machine, operators should hold position, pay attention to the machine running status at any time, in case of emergency situations should be dealt with immediately, ensure the safe operation.

1. After completing a job, the operator need to leave for equipment, main motor stop button should be shut down, and at the same time the main power switch should be closed. Before coming off work, should be spray washing time, duration of not less than about 1 minute. Before off work, should be system back to the main menu operation, will spray rose to the highest position, the control switch should be reset. Shut down the system power supply, and then close the total power supply, close the air, water, check whether the control handle is in closed position, confirmed rear can leave.
 
2. The equipment maintenance and maintenance should be timely cleaning equipment, spray when not in use for a long time, timely cleaning, to prevent clogging. For lubricant, all lubricating points on a regular basis to ensure good lubrication. Every three months to check the servo motor elastic fastening device is reliable, adjust the spring pressure bolt, make appropriate pressure. Regularly check the electrical connection wiring control system, ensure that no loose fall off. When no homework tasks, nc marker also regularly electricity, it is best to electrify 1-2 times a week, empty running every time 1 hour or so.
 

Please indicate the source of the reprint://tg-tools.com//en/news/3663.html。

Contact us

 Get in touch with us. Please use the following contact at will.

Address:Shangdang town of Dantu District,Zhenjiang City,Jiangsu Province,China Telephone:+86 13852907688  James@js-lxd.com tg-tools.com/
9号彩票(上海)集团有限公司 江苏五分(广东)集团有限公司 掌上彩票(广州)集团有限公司 幸运PK10(深圳)集团有限公司 民彩网(广东)集团有限公司 彩人间(浙江)集团有限公司 快彩网(北京)集团有限公司